10+
years’ experience
12
Bay Area cities
3–5
weeks, full remodel
San Jose Bathroom Remodeling

Bathroom Remodeling in San Jose, Finished in 3–5 Weeks

Walk-in showers, full remodels and tile work by a licensed local crew, with an itemized written price before any work starts.

Licensed & insured · 10+ years’ experience · Local Bay Area crew

Free · No obligation · We reply the same working day

Prefer to talk? Call +1 408-775-8418

Licensed & insured
Fully covered crews
Written estimates
Every line itemized
One project lead
Walkthrough to sign-off
Written warranty
On every job
Trusted by Bay Area brands
AdZone Construction logo
XHOME logo
Andy Sweat Bay Area Real Estate logo
MrFixBayArea logo
AdZone Construction logo
XHOME logo
Andy Sweat Bay Area Real Estate logo
MrFixBayArea logo
Service Details

Bathroom Remodeling Services in San Jose

From a quick refresh to a full rebuild, every bathroom is scoped in writing after a free walkthrough.

Cosmetic Refresh

New vanity, fixtures, lighting and paint with the existing layout and plumbing left where they are.

Walk-in shower with glass enclosure and double vanity
Most requested

Full Gut Remodel

Everything out to the studs, then rebuilt: waterproofing, tile, plumbing, electrical and finishes.

Marble bathroom with floating walnut vanity and glass shower

Walk-In Shower Conversion

The tub comes out and a level-entry or low-curb tiled shower goes in, without moving the room around.

Also available

Tub replacement
Tile & grout repair
Vanity installs
Accessibility upgrades
Fan & lighting upgrades

Not sure which service fits? Book a free walkthrough and we will recommend the right scope in writing.

Project Spotlight

Inside a Typical Full Bathroom Remodel

Every project starts as a measured plan you approve. Here is what a typical full bathroom remodel looks like.

Typical scope
Full gut + walk-in shower
On site
3–5 weeks
Your estimate
Itemized, in writing
Covered by
Written workmanship warranty
What Is Included

Everything Is in the Price. Nothing Gets Added Later.

Your written estimate lists every line of work, so you can compare it with any other quote.

Included in every remodel

Never on your bill as a surprise

Built To Last

Beauty on Top. Rock Solid Underneath.

Most bathroom failures start behind the tile, years after the contractor has left. These are the steps we never skip.

Tradesperson cutting tile with an angle grinder

Waterproof membrane

A continuous membrane on shower walls and floor, sealed at every seam, corner and niche.

24-hour flood test

The shower pan holds water for a full day before a single tile goes down.

Correct slope to the drain

Floors pitched to the drain so water never sits in corners or grout lines.

Cement board in wet areas

Moisture-resistant backer board behind tile, never ordinary drywall.

Fan vented outdoors

Sized to the room and ducted outside, not into the attic.

Permits & inspections

Pulled where required, so the work passes inspection and resale checks.

How It Works

From First Call to Finished Bathroom

The same four steps on a quick refresh and a full gut remodel.

01

Free Consultation

Day 1Tell us what is going on. We ask the questions that actually change the price.

02

Walkthrough & Estimate

Within 48 hoursWe measure, photograph and send an itemized scope so you can see what drives the cost.

03

Licensed Crew Builds

1–5 weeks on siteOne project lead, a written schedule, dust containment and a tidy site every evening.

04

Final Walkthrough

Final dayWe walk the finished bathroom together and close out anything on your list.

Living through it

Dust walls & floor protection
Tidy site every evening
Water off only with notice
Your lead’s direct number
Client Feedback

What the People We Work With Say

SOMO also supports property owners and contractors across the Bay Area. Here is what they say about working with our team.

Featured feedback

“Having someone who could attend the walkthrough and translate field conditions into decisions changed the pace of the project.”

RM
Regional Manager
Facility Services Firm

“SOMO gave our remote team the local clarity we needed before approving budget. The reporting was direct, visual, and easy to act on.”

OD
Operations Director
Commercial Owner

“Their proposal support helped us tighten scope and avoid several unclear exclusions before submission.”

PL
Preconstruction Lead
Specialty Contractor
Why SOMO

The Same Bathroom, Two Very Different Experiences

Most homeowners have had one of these go wrong before. Here is what changes when SOMO does the job.

Typical contractor

What homeowners tell us went wrong
Your price
Who does the work
Your schedule
Your home each evening
After the job

SOMO Home Renovation

What you get with us, in writing
Your price
Who does the work
Your schedule
Your home each evening
After the job
Swipe to compare →

Your price

1 / 5
Typical contractor
SOMO Home Renovation

Who does the work

2 / 5
Typical contractor
SOMO Home Renovation

Your schedule

3 / 5
Typical contractor
SOMO Home Renovation

Your home each evening

4 / 5
Typical contractor
SOMO Home Renovation

After the job

5 / 5
Typical contractor
SOMO Home Renovation

Ask to see a sample itemized estimate at your walkthrough.

Who Will Be In Your Home

One Local Crew, From Demolition to Sign-Off

The people who walk your bathroom and write your estimate are the same crew that shows up to build it. No rotating subcontractors, no call centre — one project lead you can reach every day of the job.

Design-Led Planning
Skilled Local Crews
Trusted Process
Questions

Answers Before You Call

Still unsure?

Ask us anything. A project lead replies the same working day.

A cosmetic refresh is usually one to two weeks. A full gut remodel runs three to five weeks from demolition to final walkthrough. You get a written schedule before any work begins.

Every project is different, so we never quote over the phone. After a free walkthrough you get an itemized written estimate showing each line of work, materials and any permits, so you can see exactly what drives the cost.

Not the one being remodelled. If it is the only bathroom in the house we will say so upfront and sequence the work to keep the downtime as short as possible.

Yes, where the work requires them — usually once plumbing or electrical moves. Permit costs sit on their own line in your estimate so nothing is buried in the total.

You do. We give you a spec list with allowances, come to the supplier with you if that helps, and lock the prices into the estimate before anything is ordered.

We stop, show you photos and price the repair in writing before doing any extra work. Nothing is added to your bill without your written approval.

Yes. SOMO carries current licensing and general liability insurance, and we are happy to show you the documentation before you sign anything.

You get a written workmanship warranty and one project lead who stays reachable after sign-off. Call us and we come back.

Free Estimate

Get Your Bathroom Price This Week

1

We call you the same working day

A project lead, not a call centre.

2

Free walkthrough

At a time that suits you. We measure and photograph.

3

Itemized written price within 48 hours

No pressure to sign.

Serving San Jose, Santa Clara, Sunnyvale, Palo Alto, Fremont, Oakland, San Francisco and nearby Bay Area cities. Permits handled where required.

Remodeled bathroom with oak vanity and freestanding tub

Your Estimate Starts With 3 Quick Questions

It takes about a minute at the top of this page. A project lead calls you back the same working day to book your free walkthrough.